Local Recovery Manager use of powers - Whakatāne District Transition #2

Recovery Manager Report to MCDEM Director #2.pdf

 

Section94P(1) to (3) of the Civil Defence Emergency Management Act 2002 requires Recovery Managers to report any use of statutory powers during a Local Transition Period.  The report must be made within 7 days of the end of the Transition Period and in accordance with s.94P(9) the report must be published on the CDEM Group website.  

The report for Transition Period #2 can be read by right-clicking the link above.

back to top

Bay of Plenty Civil Defence Emergency Management Group © Copyright 2017 All rights reserved.

Designed by OneClick | Powered by Umbraco